|
Expand All
 GLOBAL DELIVERY MODEL |
India remains a coveted offshore outsourcing destination. ennVee helps clients to take
advantage of India’s edge in quality and cost benefit. Our offshore development center
enables ennVee to work on a 24/7 basis to deliver the services in double-quick time. Our
onsite/offshore delivery model is a combination of well-refined process and procedures, to
provide cost-effective and quality solutions.
The mix of personnel on-site/off-shore is based on the requirements of your requirements.
We assist your company in designing, developing, deploying, and maintaining enterprise solutions
at ½ of the traditional cost. That represents up to 50% reduction in operational costs.
ennVee’s global delivery model enables us to deliver solutions with Speed, Value, and Quality &
Flexibility. Teams across multiple time zones deliver solutions faster, making it a virtual 24x7x365
technology entity.
In addition, our value added services include:
- Customer Contact Points (Call Center Services)
- Online Training & Upgrading Solutions
- Online Helpdesk
 PROJECT DEVELOPMENT ENVIRONMENT |
In the traditional project development environment, a wide variety of tools exist for different
activities that are carried out during the project life cycle. Recently there have been attempts
to integrate some of these tools. However, such attempts are still in primary stages. Tools do not
exist for certain activities that are vital for process maturity and through out the project life cycle,
thereby increasing manual effort on them, e.g. proactive tracking of tasks, and warning appropriately.
Various issues such as, interface to the configuration management (CM) tools, are mostly ignored by current
family of tools.
Here is complete Solution, which addresses these issues to large extent. The project development environment
(PDE – 2000) is an environment that not only provides an extremely user friendly front-end, but also a very
powerful back-end that performs wide variety of functionalities for the user. The concept of Security that is
introduced in this tool ensures appropriate data encapsulation for different users. Rich set of filters provides
detailed analysis of the various project activities. Also introduced is the process of planning and tracking the
process maturity throughout the duration of the project, with the infrastructure that embeds SEI-CMM recommendations
with the project activities. The tool provides an extensive set of offerings on various activities like task scheduling,
resource scheduling and leveling, and various mechanisms for tracking the project progress. In addition to all these,
the test process, review process, defect tracking, effective help to user in terms of Personal software process (PSP),
and a lot of features that are provided by usual contemporary tools in each of the areas also become integral part of tool.
The PDE – 2000 interfaces with wide variety of CM tools, and databases that exist. And Guess what! All these features are
completely configurable to suit the user needs.
 TOP LEVEL FEATURE LIST |
- Process Planning and Tracking system
- Review process Automation system
- Defect Tracking system
- Process Maturity Automation system
- Test Process system
- Watchdog systems for reminders and red-flags
- Personal software Process Support
- Configuration Management Tools Support
- Database connectivity
- Detailed Analysis views
- Platform Independent
- Completely configurable
- Security Model
- Error Categories
- Views
 ORGANIZATIONAL CHANGE MANAGEMENT |
Identifying new skills, behaviors and working relationships is key to the success of any
implementation project. Even more critical is the ability to successfully align these desired
organizational traits throughout the change effort. ennVee’s integrated change management
methodology provides the framework to align people and organization changes with a new desired
level of organizational performance. Although the extensive Change Management phase of our
standard methodology is not within scope for this limited project,
we will leverage the Organizational Change Methodology whenever possible to:
- Develop Change Management leadership skills (facilitate communication, team development, knowledge transfer, and securing commitment to change)
- Implement an effective communications strategy across CLIENT throughout the lifecycle of the project
- Secure organizational buy-in to the systems implementation project and associated process and organizational changes
- Encourage an environment which facilitates continuous improvement
 BUSINESS PROCESS CHANGE METHODOLOGY |
ennVee’s approach to Business Process Reengineering (BPR) emphasizes our belief that “re-engineering” is only
half of the story; implementation is the other half. Although the extensive Business Process Change phase of
our standard methodology has been deemed out of scope for the accelerated implementation, when required we will
leverage it to:
- Support the client and its strategic objectives
- Identify activities that add value to client as a business
- Minimize non-value added activities, work intelligently and efficiently, and identify alternatives for reducing the month end closing process
- Reduce workflow complexity – when in doubt, simplify and standardize!
- Incorporate “Better Practice” principles into client’s business, and
- Leverage the capabilities of the Oracle software in the “To Be” process design to Optimize the investment
 FACILITIES |
ennVee continually invests into its infrastructure. ennVee occupies an ultra-modern office in Chennai
with a total space of 10000 sq. feet, providing workplaces for 100 full-time employees.
All computers, including workstations, servers, test machines, etc. are united into a LAN secured with
firewalls. Each workplace features a modern PC with up-to-date software installed. The office is connected
to the Internet through redundant internet connections. ISDN channels are used for backup Internet connectivity.
The facilities are equipped with modern multi-channel digital PBXs. Secured communications with the client can be
organized with VPN-enabled equipment over the Internet, or direct ISDN data calls. It is also possible to install
the client's communication equipment
ennVee pays a lot of attention to the hardware reliability. All servers and workstations are equipped with
UPS, with maximum total power of 10kWt. As an additional safety precaution, ennVee uses independent power
generators from its substations as backup in case of power failure. The wiring is divided into surge-protected
and stabilized wiring for workstations and servers and regular wiring for other electric devices.
Our systems & network management team is available 24/7 to handle any emergency. Our work teams working in different
locations make use of different communication tools:
- IP Telephony and Video Conference
- Project Management Portal
- Knowledge Management Portal
- Groupware / Messenger
- Workflow and issues Tracking tool
- SCM / UML documentation tool / Modeling Tool / Automated Testing Tools
|